CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 30 September 2005 9.00am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on 29 Sept to perform a routine Electrical Interface Assembly (EIA) Sequencer self-check. The schedule of targets for next week is shown below and includes an observation of RX J0720.4-3125 as part of a monitoring program. |
------------------------------------------
Radiation Belts Oct 2 EGS-1 ACIS-I Oct 3 87GB 1447+4233 ACIS-S Oct 4 TT Ari ACIS-S/HETG cl0216-1747 ACIS-I EGS-2 ACIS-I Radiation Belts Oct 5 EGS-2 ACIS-I Oct 6 TT Ari ACIS-S/HETG EGS-5 ACIS-I Oct 7 3C 442A ACIS-I RGBJ0112+3818 ACIS-S Radiation Belts Oct 8 RX J0720.4-3125 HRC-S/LETG TT Ari ACIS-S/HETG Oct 9 RX J0720.4-3125 HRC-S/LETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports