CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 6 March 2020 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Mar 4 to perform a routine diagnostic dump of the Control Processing Electronics (CPE). Another real-time procedure was executed on Mar 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes an observation of GW170817 coordinated with VLA and HST, and an observation of SN2020oi, which is a follow-up to a Director's Discretionary Time Target of Opportunity which was accepted on Jan 21. |
------------------------------------------
Radiation Belts Mar 8
M87Halo1 ACIS-S
H1821+643 HRC-S /LETG Mar 9
A1240 ACIS-I
GW170817 ACIS-S
E0102-72 ACIS-S Mar 10
SPT-CLJ2320-5233 ACIS-I
Radiation Belts Mar 11
SPT-CLJ0217-5014 ACIS-I
Spiderweb ACIS-S Mar 12
SN2020oi ACIS-S
H1821+643 HRC-S /LETG
A1240 ACIS-I Mar 13
GW170817 ACIS-S
Radiation Belts Mar 14
SPT-CLJ2323-5753 ACIS-I
Spiderweb ACIS-S
GW170817 ACIS-S Mar 15
SPT-CLJ2334-5308 ACIS-I
GW170817 ACIS-S
Radiation Belts Mar 16------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

