Friday 3 April 2020 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Apr 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Of note this week were the Chandra Quarterly Review conducted on Apr 1 by teleconference and the Chandra Cycle 22 proposal deadline on Apr 2 at 6pm EDT. The schedule of targets for the next week is shown below and includes an observation of PKS0620-52, which was accepted as Target of Opportunity on Feb 5. |
------------------------------------------
CIZAJ0107.7+5408 ACIS-I Apr 6
Radiation Belts
PKS0620-52 ACIS-I
CIZAJ0107.7+5408 ACIS-I Apr 7
JWST-DTDF-9 ACIS-I
HD114174 HRC-I
JWST-DTDF-9 ACIS-I Apr 8
SPT-CLJ1315-2806 ACIS-I
SDSSJ1346+5858 ACIS-S
Radiation Belts Apr 9
NGC4472ULXs ACIS-S
H1821+643 ACIS-S
Spiderweb ACIS-S Apr 10
H1821+643 ACIS-S
SPT-CLJ1315-2806 ACIS-I Apr 11
SNR0509-67.5 ACIS-S
Radiation Belts Apr 12
SPT-CLJ1315-2806 ACIS-I
KIC11606854 ACIS-S
Spiderweb ACIS-S Apr 13------------------------------------------
All spacecraft subsystems continued to support nominal operations.