Friday 7 January 2022 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jan 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Jan 9
GraLJ1537-3010 ACIS-S
[VV2006]J083322.5+0 ACIS-S
2RXSJ063742.6+16235 ACIS-S Jan 10
MR2251-178 HRC-S /LETG
HEPG189.430+04.404 ACIS-I
SDSSJ083247.64+2302 ACIS-S
GraLJ1537-3010 ACIS-S
PKS1136-135 ACIS-S Jan 11
UGC4308 ACIS-S
Radiation Belts Jan 12
ESO137-G034 ACIS-S
MOOJ1046+2758 ACIS-I
[FGC2019]NGC5846U HRC-I
IRAS09104+4109 ACIS-S Jan 13
SDSSJ164235.52+4223 ACIS-S
RXJ1053.7+5735 ACIS-S
WISEAJ071310.46+725 ACIS-S
MAXIJ0556-332 ACIS-S Jan 14
Radiation Belts
ESO137-G034 ACIS-S
SDSSJ164235.52+4223 ACIS-S Jan 15
UGC4107 ACIS-S
[FGC2019]NGC5846U HRC-I
IRAS09104+4109 ACIS-S
UGC4308 ACIS-S Jan 16
SDSSJ161400.30-01100 ACIS-S
PKS1150+497 ACIS-S
MAXIJ0556-332 ACIS-S
Radiation Belts Jan 17------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports