CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 8 April 2022 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Apr 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes observations of 4U 1626-67 coordinated with IXPE. |
------------------------------------------
PSZ2G145.19+32.14 ACIS-I Apr 10
3c297 ACIS-S Apr 11
KeplerSNR ACIS-S/HETG
Radiation Belts
LAMOSTJ220809.97+25 ACIS-S Apr 12
GJ1183AB ACIS-S
KeplerSNR ACIS-S/HETG
VIKINGJ231818.3-311 ACIS-S
PSZ2G358.98-67.26 ACIS-I
NGC5792 ACIS-S
GDHIdp46 (6 obs) ACIS-I Apr 13
GDHIdp48 (6 Obs) ACIS-I
GDHIdp52 (6 obs) ACIS-I Apr 14
GDHIdp63 ACIS-I
Radiation Belts
LAMOSTJ220809.97+25 ACIS-S
WISEAJ140048.45+042 ACIS-S
SN2016coi ACIS-S Apr 15
Abell2029 ACIS-I
PSZ2G059.81-39.09 ACIS-I
Abell2029 ACIS-I
4U1626-67 ACIS-S/HETG
GDHIdp63 ACIS-I Apr 16
GDHIdp63 ACIS-I
Radiation Belts Apr 17
VIKINGJ231818.3-311 ACIS-S
GDHIdp63 ACIS-I
GDHIdp63 ACIS-I
GDHIdp63 ACIS-I
CMZMolecularCloud ACIS-I
PSZ2G306.02+34.47 ACIS-I Apr 18
VIKINGJ231818.3-311 ACIS-S------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports

