CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 3 June 2022 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jun 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Jun 6
ASASSN-14ko ACIS-S
GDH21 ACIS-I
GDH21 ACIS-I Jun 7
GDH21 ACIS-I
GDH21 ACIS-I
GDH21 ACIS-I
PSRB0833-45 ACIS-S
CMZMolecularCloud ACIS-I Jun 8
HD93129A ACIS-S
SDSSJ130502.28+05215 ACIS-S
Radiation Belts Jun 9
KeplerSNR ACIS-S/HETG
JWST-DTDF-1 ACIS-I
KeplerSNR ACIS-S/HETG Jun 10
B21600+24 ACIS-S
PKS1136-135 ACIS-S
ASASSN-14ko ACIS-S Jun 11
CMZMolecularCloud ACIS-I
PKS1830-211 ACIS-S
Radiation Belts
GX3+1 ACIS-S/HETG
SDSSJ010607.17+0046 ACIS-S Jun 12
GX3+1 ACIS-S/HETG
Abell2744 ACIS-I
PLCKESZG342.31-34.90 ACIS-I------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports

