Friday 9 September 2022 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Sep 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Another real-time procedure was executed on Sep 8 to uplink a flight software patch to update several Telescope subsystem K-Constants to prevent grating insertion/retraction movement failures. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Sep 12
JWST-DTDF-1 ACIS-I
piaqr ACIS-S/HETG Sep 13
CMZMolecularCloud ACIS-I
Abell2744 ACIS-I
GDHIdp43 ACIS-I
GDHIdp43 ACIS-I
GDHIdp43 ACIS-I Sep 14
GDHIdp43 ACIS-I
GDHIdp43 ACIS-I
GDHIdp43 ACIS-I
piaqr ACIS-S/HETG
4FGLJ1702.7-5655 ACIS-S
Radiation Belts Sep 15
CMZMolecularCloud ACIS-I
SDSSJ231235.80-08313 ACIS-S
PSRJ1849-0001 ACIS-I
SDSSJ222741.66+00283 ACIS-S Sep 16
B2.21439+25 ACIS-S
PKSB2224+006 ACIS-S
CMZMolecularCloud ACIS-I Sep 17
Radiation Belts
Abell2744 ACIS-I
IRAS09104+4109 ACIS-S Sep 18
PSZ2G104.71-54.54 ACIS-I
PSZ2G057.08-74.45 ACIS-I------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.