News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 7 June 2024 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Jun 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

An additional real-time procedure was executed on Jun 5 to determine new values for the HRC-I high-voltage ramp-up steps. The new voltage compensates for an expected decrease in HRC-I gain over the course of the mission.

Of note this week was the release on Jun 6 of the CalDB version 4.11.2. The CalDB update includes an HRC-I MEAN QE file set upgrade to version N0015. https://cxc.cfa.harvard.edu/caldb/downloads/Release_notes/CALDB_v4.11.2.html

Also of note this week was the second announcement of the symposium "25 Years of Science with Chandra", to be held in Boston December 3-6, 2024. https://cxc.cfa.harvard.edu/cdo/symposium_2024

The schedule of targets for the next week is shown below and includes an observation of SDSS J163810.07+1151 coordinated with HET, an observation of SS 433 coordinated with Swift and an observation of EP240414a which was accepted as a Director's Discretionary Time Target of Opportunity on May 16.



------------------------------------------
        GAL034.8-00.6IRDC      ACIS-I       Jun  9
        SDSSJ163810.07+1151    ACIS-S       Jun 10
        Radiation Belts
        PS-ELQSJ092642.05-1    ACIS-S
        NGC6242                ACIS-I
        eRASSUJ112636.4-10     HRC-I        Jun 11
        SPT-CLJ2249-5528       ACIS-I
        HZ43                   HRC-S /LETG
        NGC6242                ACIS-I
        PS-ELQSJ092642.05-1    ACIS-S       Jun 12
        WHLJ223301.3+131503    ACIS-I
        V750Ara                ACIS-S/HETG
        Radiation Belts                     Jun 13
        WHLJ223301.3+131503    ACIS-I
        PSR_B1821m24_s10       ACIS-S
        DESJ0322-18            ACIS-S
        CMZMolecularCloud      ACIS-I       Jun 14
        DESJ0322-18            ACIS-S
        CMZMolecularCloud      ACIS-I
        DESJ0322-18            ACIS-S
        XMMJ0.173-0.413        ACIS-I       Jun 15
        SS433                  HRC-I
        A1795                  ACIS-I
        Radiation Belts
        V750Ara                ACIS-S/HETG
        EP240414a              ACIS-S       Jun 16
        eRASSUJ175532.5-503    ACIS-S
        SDSSJ230013.20-0956    ACIS-S
        NGC5477                ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports