News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
Web Shortcuts
Chandra Blog
RSS Feed
Image Use Policy
Questions & Answers
Glossary of Terms
Operations CXO Status Report

Friday 10 January 2025 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Jan 8 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

The schedule of targets for the next week is shown below.



------------------------------------------
        Radiation Belts                     Jan 13
        NGC1300                ACIS-S
        SDSSJ082730.64+1921    ACIS-S
        PSRJ1418-6058          ACIS-I       Jan 14
        A1795                  ACIS-I
        SDSSJ082730.64+1921    ACIS-S
        PSRJ1418-6058          ACIS-I
        Abell795               ACIS-S       Jan 15
        PSOJ170.8326+20.208    ACIS-S
        SDSSJ131012.35+1656    ACIS-S
        Radiation Belts                     Jan 16
        NGC1300                ACIS-S
        Abell795               ACIS-S
        Abell370               ACIS-I
        NGC2775                ACIS-S       Jan 17
        SDSSJ145138.27+0903    ACIS-S
        NGC2775                ACIS-S
        SDSSJ160158.51+4705    ACIS-S
        HD75332                HRC-I
        IGRJ15550-4306         ACIS-I       Jan 18
        NGC4781                ACIS-S
        Radiation Belts
        Abell370               ACIS-I
        ZwCl0857.9+2107        ACIS-S       Jan 19
        Abell370               ACIS-I
        NGC2775                ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports