CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 3 October 2025 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Sep 26 to perform an annual check-out of A-side MUPS thrusters, which are selected for use when Chandra is in its safe-mode configuration. Thrusters A2, A3, and A4 were fired and performed nominally. Thruster A1 was not fired due to the expected limited life remaining on it. Additional real-time procedures were executed on Oct 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Oct 5
ACT-CL_J0034.4+0225 ACIS-S
PSRJ2017+3625 ACIS-I Oct 6
ACT-CL_J0034.4+0225 ACIS-S
4U1626-67 HRC-S /LETG
Abell370 ACIS-I
Radiation Belts Oct 7
1E161348-5055.1 ACIS-S
SDSSJ003723.49+00081 ACIS-S
1E161348-5055.1 ACIS-S Oct 8
PSZ2G302.85-88.63 ACIS-I
MCG_01_05_047_s2 ACIS-S
NGC3516 ACIS-S/HETG
Abell370 ACIS-I Oct 9
NGC1546 ACIS-S
Radiation Belts Oct 10
NGC2566 ACIS-S
SDSSJ015634.87-0110 ACIS-S
HEPG226.816-02.799 ACIS-I
NGC2566 ACIS-S
Abell370 ACIS-I Oct 11
IGRJ07141+0146 ACIS-I
HEPG230.954+02.322 ACIS-I
Abell370 ACIS-I
1eRASSJ080701.4+023 ACIS-S
PSRJ2229+6114 ACIS-I
Radiation Belts Oct 12------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

