CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 31 October 2025 9.00am EDT
During the last week Chandra's observing schedule was impacted by an anomaly where the High Resolution Camera (HRC-S) high voltage power supply was unexpectedly disabled at the start of an HRC-S observation. A real time procedure was run on Oct 24 to safe the HRC instrument and to prevent two subsequent HRC observations in the weekly loads from running. The cause of the HRC anomaly is under investigation. All HRC science observations are temporarily suspended. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Nov 2
SDSSJ114805.44+2149 ACIS-S
Perseuscluster ACIS-I
SDSSJ131603.91+2922 ACIS-S
SN1986J ACIS-S
SDSSJ131603.91+2922 ACIS-S
PSZ2G144.99-24.64 ACIS-I Nov 4
V444Cyg ACIS-S/HETG
Perseuscluster ACIS-I
CenterofCOSMOS-Web ACIS-I
PSZ2G144.99-24.64 ACIS-I Nov 5
Radiation Belts
NGC3239 ACIS-S
PSZ2G144.99-24.64 ACIS-I
NGC3239 ACIS-S Nov 6
PSZ2G144.99-24.64 ACIS-I
CenterofCOSMOS-Web ACIS-I
PSZ2G144.99-24.64 ACIS-I
NGC1140 ACIS-S
VVPup ACIS-S/HETG
NGC1140 ACIS-S Nov 7
IC5273 ACIS-S
SDSSJ014837.63+0600 ACIS-I
Radiation Belts Nov 8
NGC3511 ACIS-S
1RXSJ031639.0+15543 ACIS-S
NGC3511 ACIS-S
NGC1140 ACIS-S
IC5273 ACIS-S Nov 9
SDSSJ022226.11-0857 ACIS-S
2MASSJ17422050-5146 ACIS-S
SDSSJ014837.63+0600 ACIS-I------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports

