Friday 7 September 2007 8.00am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Sep 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below. |
------------------------------------------
CGCG 448-020 ACIS-S Sep 10 ESO 239-IG002 ACIS-S IRAS F01364-1042 ACIS-S SDSS J013416.34+00 ACIS-S A2744 ACIS-I SNR1987A ACIS-S/LETG Radiation Belts Sep 11 SNR1987A ACIS-S Sep 12 Cen X-3 ACIS-S/HETG SNR1987A ACIS-S/LETG A2065 ACIS-I NGC 2392 ACIS-S Sep 13 HCG 7 ACIS-S Radiation Belts Sep 14 SNR1987A ACIS-S/LETG CPD-572874 ACIS-I Sep 15 NGC2563-P4 ACIS-I HCG 7 ACIS-S SNR1987A ACIS-S/LETG Sep 16 NGC 1703 ACIS-S A3158 ACIS-I UGC 1922 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.