News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 7 September 2007 8.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Sep 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below.

------------------------------------------
CGCG 448-020           ACIS-S       Sep 10
ESO 239-IG002          ACIS-S
IRAS F01364-1042       ACIS-S
SDSS J013416.34+00     ACIS-S
A2744                  ACIS-I
SNR1987A               ACIS-S/LETG
Radiation Belts                     Sep 11
SNR1987A               ACIS-S       Sep 12
Cen X-3                ACIS-S/HETG
SNR1987A               ACIS-S/LETG
A2065                  ACIS-I
NGC 2392               ACIS-S       Sep 13
HCG 7                  ACIS-S
Radiation Belts                     Sep 14
SNR1987A               ACIS-S/LETG
CPD-572874             ACIS-I       Sep 15
NGC2563-P4             ACIS-I
HCG 7                  ACIS-S
SNR1987A               ACIS-S/LETG  Sep 16
NGC 1703               ACIS-S
A3158                  ACIS-I
UGC 1922               ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports