Friday 7 March 2003 11.00am EST
| During the last week Chandra completed the observing schedule as planned.
Of note last week was the approval by the Flight Director Board of the transition to DSS-24 following its upgrade to DSN's next generation NSP (Network Simplfication Project) equipment. Following an initial problem identifed during testing, the system is now ready to support Chandra. The Chandra Cycle 5 proposal deadline is March 14 at 7pm EST. The observing schedule for next week is shown below. |
------------------------------------------
Radiation Belts Mar 9 M87 ACIS-S NGC4527 ACIS-S NGC4418 ACIS-S RX J151942.8-375255 ACIS-S Mar 10 XTE J1807-294 HRC-S BR 2213-6729 ACIS-S A514 ACIS-I IIIZW54 ACIS-I RX J062740.3+073103 ACIS-S Mar 11 LNS 6 ACIS-S TXS 0726+499 ACIS-S CEP B ACIS-I Radiation Belts IC 10 ACIS-S Mar 12 GEV J2035+4214 ACIS-I IRAS 20126+4104 ACIS-I CTB 80 HRC-S Mar 13 PSS 1506+5220 ACIS-S Mar 14 Radiation Belts NGC 1265 ACIS-S TXS 0756+303 ACIS-S Mar 16 PC 1035+4747 ACIS-S BD1137+3000 ACIS-S NGC4013 ACIS-S 2MASS104943+583750 ACIS-S
------------------------------------------
All spacecraft subsystems, with the exception of MUPS thruster A-1 as noted above, continued to operate nominally.
Return to Status Reports