| During the last week Chandra completed the observing schedule as planned.
The first Aspect Camera dark current calibration following the lowering of the CCD temperature from -10 to -15 deg C was conducted on July 14. An Initial analysis of the data indicates a reduction in the number of warm pixels by 50-60%, as expected. During the last week the IRU-1 gyro-1 current remained near a base level of 150 mA with some noisy periods. Products and procedures are on track for the planned swap to IRU-2 scheduled for 7.30am EDT on July 19. The swap is planned during a perigee passage and is not expected to impact science operations. The observing schedule for next week is shown below and includes an observation of Eta Carina coordinated with RXTE. |
------------------------------------------
Eta Carinae ACIS-S/HETG Jul 19 SCO X-1 ACIS-S/HETG Jul 21 PKS 2316-423 ACIS-S PKS0537-28_2 ACIS-I Radiation Belts NGC 7212 ACIS-S Jul 22 NGC 4051 HRC-S/LETG HZ43 HRC-S/LETG Jul 23 HZ43 HRC-I/LETG Jul 24 M8 ACIS-I Radiation Belts M8 ACIS-I Jul 25
------------------------------------------
All spacecraft subsystems, with the exception of the MUPS thruster A-1 under investigation, continued to operate nominally.
Return to Status Reports