Friday 26 September 2003 8.30am EDT
| During the last week Chandra completed the observing schedule as planned.
Of note last week was the approval by the Flight Director Board of an update to the IRU-2 calibration k-constants based on data taken since the IRU swap in July. The observing schedule for next week is shown below and includes an observation of GX 339-4 coordinated with ASCA. |
------------------------------------------
Radiation Belts Sep 28 GX 339-4 ACIS-S NGC 752 ACIS-I Sep 29 Radiation Belts Oct 1 1RXS J020052.9-09243 ACIS-S NGC 1313 ACIS-I Oct 2 0550-683 ACIS-S G16.7+0.1 ACIS-S Oct 3 G85.9-0.6 ACIS-S NGC 5204 X-1 ACIS-S Radiation Belts AX J1226.8-6249 ACIS-S Oct 4 G351.2+0.1 ACIS-S 4C 37.43 Field ACIS-I RXJ1205 ACIS-S Oct 5 Her X-1 ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to operate nominally.