News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 7 October 2011 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the fifth, sixth, and seventh eclipses of the fall season on Oct 1, 4, and 6 respectively, with nominal power and thermal performance. A real-time procedure was executed on Oct 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was executed on Oct 6 to patch the Central Processing Electronics (CPE) in preparation for the Draconids meteor shower on Oct 8. The patch sets the CPE yaw bias to zero and will be backed out after the meteor shower.

The schedule of targets for the next week is shown below and includes an observation of MAXIJ1659-152, from a series of Target of Opportunity observations accepted on Apr 5, and an observation of the Crab, from a series of Director's Discretionary Time TOO observations accepted on Dec 14.



------------------------------------------
A133-8                 ACIS-I          Oct 10
    IGRJ16173-5023         ACIS-I          Oct 11
    SAXJ1712.6-3739        ACIS-S
    1RXSJ170741.7-32314    ACIS-S          Oct 12
    Radiation Belts
    MAXIJ1659-152          ACIS-S
    1RXSJ170428.0-25352    ACIS-S          Oct 13
    1RXSJ175911.0-34492    ACIS-S
    3C459                  ACIS-S
    A133-6                 ACIS-I
    Radiation Belts                        Oct 14
    Crab                   ACIS-S          Oct 15
    MG0414+0534            ACIS-S
    A133-8                 ACIS-I
    IC348                  ACIS-I          Oct 17
    Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports