News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
Web Shortcuts
Chandra Blog
RSS Feed
Image Use Policy
Questions & Answers
Glossary of Terms
Operations CXO Status Report

Friday 13 July 2012 9.00am EDT

During the last week the observing schedule was interrupted by a high-radiation event that activated the science instrument safing sequence (SCS 107) and stopped observing at 3:59pm on Jul 12. All spacecraft actions were nominal. A real-time procedure was executed on Jul 13 to disable SCS-29, which was enabled during the safing sequence. Observations of Sgr A* were impacted and will be rescheduled. Planning is underway to attempt a resumption of observing this evening.

Of note this week was the "X-ray Binaries - Celebrating 50 Years Since the Discovery of Sco X-1" science workshop being held in Boston, Jul 10-12.

The schedule of targets for the next week is shown below and includes observations of Sgr A* coordinated with NuSTAR, Keck, VLT, SMA, CSO, CARMA, ALMA, EHT, HESS, and ATCA, an observation of Holmberg IX X-1 coordinated with HST, and an observation of 3C 273 coordinated with NuSTAR.



------------------------------------------
Radiation Belts                     Jul 15
       CXOUJ171405.7-38103    ACIS-S       Jul 16
       3C273                  ACIS-S/HETG
       FGC539                 ACIS-S
       SDSSJ1154+1848         ACIS-S       Jul 17
       HD152404_P1            ACIS-S
       SgrA*                  ACIS-S/HETG
       Radiation Belts                     Jul 18
       PSRJ1753-1914          ACIS-S
       SgrA*                  ACIS-S/HETG
       six-15                 ACIS-I       Jul 19
       HolmbergIXX-1          ACIS-S
       M31                    ACIS-I
       J1458.4-2447           ACIS-I       Jul 20
       SgrA*                  ACIS-S/HETG
       Radiation Belts                     Jul 21
       SgrA*                  ACIS-S/HETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports