Operations CXO Status Report

Friday 9 October 2015 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Oct 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

A Chandra image release was issued on Oct 8 to commemorate American Archive Month. A collection of six new images from the Chandra archive were released. These highlight how archives like those of Chandra and other major observatories will enable future exploration and research. For details see: http://chandra.harvard.edu/photo/2015/archives/

The schedule of targets for the next week is shown below and includes an observation of PHAT B18 coordinated with NuSTAR, and of V5668 Sgr, which was accepted as a Target of Opportunity on Oct 5.



------------------------------------------
        Mrk1044                ACIS-S       Oct 12
        SNR0453-669            ACIS-S
        CXOUJ171405.7-38103    ACIS-S       Oct 13
        Radiation Belts
        CygnusA-EHotspot       ACIS-I       Oct 14
        M31bulge               ACIS-I
        Mrk1044                ACIS-S
        2FGLJ0842.9-4721       ACIS-I       Oct 15
        LocalLeoColdCloud      ACIS-S
        CygnusA-EHotspot       ACIS-I
        SDSSJ010013.02+2802    ACIS-S       Oct 16
        Radiation Belts
        Mrk1044                ACIS-S
        V5668Sgr               HRC-S /LETG
        HD97658                ACIS-S       Oct 17
        NGC3906                ACIS-S
        PHATB18                ACIS-I
        SDSSJ102839.11+4500    ACIS-S       Oct 18
        NLTT28469              ACIS-S
        CygnusA-EHotspot       ACIS-I
        Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports