News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 30 September 2016 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Of note this week was the Chandra User Committee meeting held at the CXC on Sep 27-28.

The schedule of targets for the next week is shown below and includes observations of SgrA* and M82 offset 2 coordinated with NuSTAR.



------------------------------------------
        SDSS2300-0005          ACIS-S       Oct  3
        NGC890                 ACIS-S
        Sw1644+57              ACIS-S
        G292.0+1.8             ACIS-I       Oct  4
        Radiation Belts                     Oct  5
        G292.0+1.8             ACIS-I
        J020549.3-094920.3     ACIS-S
        XLSSJ022709.2-04180    ACIS-S
        PSZ2G071.82-56.55      ACIS-I       Oct  6
        SPT-CLJ0646-6236       ACIS-I
        G292.0+1.8             ACIS-I
        Radiation Belts                     Oct  7
        SPT-CLJ0646-6236       ACIS-I
        M82offset2             ACIS-I       Oct  8
        XLSSJ022059.0-04392    ACIS-S
        XLSSJ022253.6-03282    ACIS-S
        ALPHACEN               HRC-I
        SgrA*                  ACIS-S
        XLSSUJ021524.1-0343    ACIS-S       Oct  9
        G292.0+1.8             ACIS-I
        PSZ2G084.10+58.72      ACIS-I
        Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports