CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
7. High Resolution Mirror Assembly
All mirrors installed. Final wiring in progress prior to collimator installations.
All mirrors installed. Final wiring in progress prior to collimator installations.
Download:
8. High Resolution Mirror Assembly
All P-mirrors installed. Note CAP Offloaders/Hardpoints.
All P-mirrors installed. Note CAP Offloaders/Hardpoints.
Download:
9. High Resolution Mirror Assembly
All H-mirrors installed. Note MAS interface points on the tops of the mirrors.
All H-mirrors installed. Note MAS interface points on the tops of the mirrors.
Download:
10. High Resolution Mirror Assembly
Final inspection of P-mirrors. Note Pre-Collimator in the background.
Final inspection of P-mirrors. Note Pre-Collimator in the background.
Download: